Honda Racing

SCOPE: Battery Test Facility Installation
DISCIPLINES: Electrical and Mechanical

Honda Racing needed to make significant investment in their facility at Milton Keynes over a 12 month period. During this period, working closely with the client, EPS demonstrated its ability to respond in a timely and agile manner to a wide variety of capital projects for which we acted as Principal Contractor.

• Siting and fit out of a new battery test facility comprising 5 bespoke containers
• Linking of battery unit to existing facility
• Warehouse area transformation with a new laboratory and mezzanine level

The common theme for all these projects was the requirement to avoid any dust contamination in critical operational areas that needed to keep running throughout the project. This was a particular challenge as traditional architectural finishes were specified, aligning with existing facilities. Working with the client and key supply chain projects this requirement was accomplished through careful design and a highly motivated site team.