SCOPE: Office Fir-Out and Refurbishment
DISCIPLINES: Office Fit-Out and Electrical

This project was awarded by Fujitsu for Fire Alarm replacement within the large multi storey offices at Bracknell. However, initial validations and surveys confirmed that a complete redesign was required, with the scope expanding to a CAT A and CATB refurbishment of the entire 10th floor.

The process of the redesign of the scope of the project was successfully achieved by EPS taking an inclusive approach, working closely with the Fujitsu project team including contract administration, service consultants and architectural design.

EPS’s ability to adapt with agility to the re-design allowed for a complete strip out and refurbishment of the floor to be completed successfully in 14 weeks. Despite this aggressive programme, quality and safety were not compromised. Fujitsu remained closely involved during the close out weeks of the construction phase, allowing EPS to manage the re-occupation of the floor. This resulted in a new fit for purpose space, ready for re-occupation on the day of Practical Completion.

As a result of our delivery strategy, close management of supply chain and client liaison, EPS have secured a framework agreement to undertake the same works to the 10 Floors of this facility.